सडक तथा यातायात इन्जिनियरिङ: प्रश्न र उत्तर
सही लागेको विकल्पमा थिच्नुहोस्। सही भए हरियो, गलत भए रातो देखिन्छ; ३ सेकेन्डपछि सही उत्तर र व्याख्या देखिन्छ।
सही: ० / ०
-
Clearing roadside drains, cutting grass and filling small potholes regularly are part of:
सही उत्तर: ग) Routine maintenance
Routine maintenance covers small, frequent activities funded every year to keep the road and its drainage in working order.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
As per the maintenance categories used by the Department of Roads, Nepal, resurfacing a road every few years is an example of:
सही उत्तर: ग) Periodic maintenance
Routine (daily/seasonal small works), recurrent (repairs as needed), periodic (resealing/overlay at intervals) and emergency (after disasters) are the main categories.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A retaining wall on a hill road is constructed on the:
सही उत्तर: ख) Valley side to support the road formation (fill)
Retaining walls on the valley side hold the fill supporting the road; breast walls on the hill side protect the cut slope.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Bio-engineering for slope protection along roads in Nepal means:
सही उत्तर: क) Using vegetation, alone or with small civil structures, to stabilise slopes
Grasses, shrubs and trees reinforce and drain the surface soil; combined with small structures they control erosion and shallow slides economically.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A mountable kerb on a road is one that:
सही उत्तर: ख) Allows vehicles to climb over it when required, as at medians or parking edges
Mountable kerbs are low with sloping faces so vehicles can cross them; barrier kerbs are high and steep to stop vehicles.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Subsurface drainage in highways is mainly provided to:
सही उत्तर: ख) Lower the groundwater table and keep the subgrade from becoming saturated
Longitudinal subsurface drains lower a high water table, preventing loss of subgrade strength.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A road structure over a seasonal stream designed to be submerged during floods, allowing traffic to pass in normal flow, is a:
सही उत्तर: ख) Causeway (Irish crossing)
Causeways are low-cost crossings that are overtopped during floods, common on rural roads of Nepal.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
As per IRC, a cross-drainage structure with a total length (span) up to 6 m is classified as a:
सही उत्तर: ख) Culvert
Cross-drainage works up to 6 m total span are culverts; longer ones are bridges.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
The roller generally preferred for the final finishing of bituminous surfaces is the:
सही उत्तर: ख) Smooth-wheeled (tandem) roller
Smooth steel-wheeled rollers give a smooth, dense finish; pneumatic-tyred rollers are used for intermediate kneading.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A seal coat is applied on a bituminous surface mainly to:
सही उत्तर: ग) Make an open-textured surface impervious to water
A seal coat closes the voids of porous bituminous surfaces such as premix carpet, preventing water entry.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
यी अभ्यास प्रश्न हुन्, आधिकारिक प्रश्न होइनन्। पाठ्यक्रम, विज्ञापन र नतिजाका लागि सम्बन्धित निकायको आधिकारिक वेबसाइट हेर्नुहोस्। उत्तरमा गल्ती भेटे प्रश्नमुनिको "टिप्पणी / गल्ती रिपोर्ट" मा लेख्नुहोस्।
नमस्ते! पाठ्यक्रम, सामान्य ज्ञान, भाषा परीक्षा वा कुनै प्रश्नको उत्तर बुझ्न सोध्नुहोस्।
AI ले गल्ती गर्न सक्छ। महत्वपूर्ण कुरा आधिकारिक स्रोतमा जाँच्नुहोस्।