The radial line method of indirect contouring, in which spot levels are taken along lines radiating from a central point, is best suited to:
सही उत्तर: क) Hilly areas such as a conical hill
Radial lines from a central station on a hill top give well-distributed spot levels for interpolating contours in hilly terrain.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
In the direct method of contouring:
सही उत्तर: ग) Points lying exactly on selected contours are located on the ground and then plotted
The direct method traces each contour on the ground with level and staff; it is accurate but slow, unlike indirect (interpolation) methods.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Where there is a vertical cliff, contour lines on a map:
सही उत्तर: घ) Coincide and appear as a single line
On a vertical face several contours lie one above another, so in plan they merge into one line.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Whether two points are intervisible can be checked from a contour map by:
सही उत्तर: ख) Drawing the ground profile (section) along the line joining them
A section drawn along the line from contour crossings shows whether any intervening ground rises above the line of sight.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
The hypsometer determines the altitude of a place by measuring:
सही उत्तर: क) The boiling point of water at that place
Since the boiling point of water falls as atmospheric pressure decreases with height, measuring it gives an estimate of altitude.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
After levelling from a benchmark to a set of points, running a line of levels back to the starting benchmark to verify the work is called:
सही उत्तर: ख) Check levelling
Check levelling closes the circuit back to a known benchmark so that the closing error shows the accuracy of the work.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
In a two-peg test, with the level midway between A and B the readings are A = 1.500 m, B = 1.000 m. With the level close to A the readings are A = 1.400 m, B = 0.960 m. The line of collimation is:
सही उत्तर: घ) Inclined upwards, giving an error of 0.060 m at B
True difference: B is 0.500 m higher. From near A, the correct reading at B is 1.400 − 0.500 = 0.900 m; the observed 0.960 m is too high by 0.060 m, so the sight line points upward.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
From a benchmark of RL 100.000 m, a back sight of 1.200 m is taken; then a fore sight of 2.500 m on a change point, after which the level is shifted and a back sight of 1.800 m is taken on the same change point. The height of instrument at the second set-up is:
सही उत्तर: क) 100.500 m
HI1 = 101.200; RL(CP) = 101.200 − 2.500 = 98.700; HI2 = 98.700 + 1.800 = 100.500 m.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A levelling staff fitted with a sliding target, which the staffman moves and reads on the instrument person's signals, is called a:
सही उत्तर: क) Target staff
With a target staff the staffman sets and reads the target; with a self-reading staff the instrument person reads the graduations directly.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
The bearings on an ordinary prismatic compass can usually be read directly to:
सही उत्तर: घ) 30 minutes
The prismatic compass ring is graduated to half a degree, so readings are taken to about 30 minutes.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
यी अभ्यास प्रश्न हुन्, आधिकारिक प्रश्न होइनन्। पाठ्यक्रम, विज्ञापन र नतिजाका लागि सम्बन्धित निकायको आधिकारिक वेबसाइट हेर्नुहोस्। उत्तरमा गल्ती भेटे प्रश्नमुनिको "टिप्पणी / गल्ती रिपोर्ट" मा लेख्नुहोस्।
नमस्ते! पाठ्यक्रम, सामान्य ज्ञान, भाषा परीक्षा वा कुनै प्रश्नको उत्तर बुझ्न सोध्नुहोस्।
AI ले गल्ती गर्न सक्छ। महत्वपूर्ण कुरा आधिकारिक स्रोतमा जाँच्नुहोस्।