The carpet area of a building is the:
सही उत्तर: घ) Usable floor area excluding walls and circulation areas such as stairs, lifts and verandahs
Carpet area is the net usable area of rooms; plinth area includes the walls, and circulation areas are excluded from carpet area.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A site order book at a construction site is used to:
सही उत्तर: घ) Record instructions given by the engineer or supervisor to the contractor
The site order book records inspecting officers' instructions and the contractor's compliance, serving as a contractual record.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Wearing safety helmets, safety shoes and harnesses on construction sites is an example of:
सही उत्तर: ग) Personal protective equipment (PPE)
PPE protects the individual worker and is the last line of defence in the hierarchy of hazard controls.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
According to Henri Fayol, which of the following is one of the basic functions of management?
सही उत्तर: क) Planning
Fayol's functions are planning, organising, commanding (directing), coordinating and controlling.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Which of the following is an owning cost (not an operating cost) of construction equipment?
सही उत्तर: क) Depreciation
Owning costs (depreciation, interest, insurance, taxes) accrue whether or not the machine works; fuel, lubricants and operator wages are operating costs.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A bulldozer is mainly used for:
सही उत्तर: ग) Pushing earth over short distances, clearing and spreading
A bulldozer is a crawler tractor with a front blade, used for short-haul pushing, site clearing, spreading and grading.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
For excavating soft material below its own track level, especially under water as in river beds, the most suitable equipment is the:
सही उत्तर: ख) Dragline
A dragline casts its bucket and drags it toward itself, reaching below its standing level and into water; a power shovel digs above its track level.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
An excavator with a 1 m³ bucket (fill factor 0.9) has a cycle time of 30 s and works 50 minutes per hour. Its hourly output is:
सही उत्तर: ग) 90 m³/h
Cycles per hour = 3600/30 = 120; output = 1 × 0.9 × 120 × 50/60 = 90 m³/h.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
In a CPM network, the slack of an event (node) is equal to:
सही उत्तर: क) Latest event time minus earliest event time
Event slack = TL − TE; events on the critical path have zero slack.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
A milestone chart is an improvement over a simple bar chart because it:
सही उत्तर: क) Shows key events (milestones) within each activity bar
Milestones mark important events inside the bars, helping progress control, though dependencies are still not fully shown.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
यी अभ्यास प्रश्न हुन्, आधिकारिक प्रश्न होइनन्। पाठ्यक्रम, विज्ञापन र नतिजाका लागि सम्बन्धित निकायको आधिकारिक वेबसाइट हेर्नुहोस्। उत्तरमा गल्ती भेटे प्रश्नमुनिको "टिप्पणी / गल्ती रिपोर्ट" मा लेख्नुहोस्।
नमस्ते! पाठ्यक्रम, सामान्य ज्ञान, भाषा परीक्षा वा कुनै प्रश्नको उत्तर बुझ्न सोध्नुहोस्।
AI ले गल्ती गर्न सक्छ। महत्वपूर्ण कुरा आधिकारिक स्रोतमा जाँच्नुहोस्।