The usual sequence of surveys for a new road or canal route is:
सही उत्तर: ग) Reconnaissance, preliminary survey and location (final) survey
Reconnaissance identifies possible routes, the preliminary survey compares them and the location survey sets out the chosen route.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
The Weisbach triangle method is used in tunnel and mine surveying to:
सही उत्तर: ख) Transfer the surface alignment underground through a vertical shaft using two plumb wires
The instrument is set slightly off the line of two plumb wires hanging in the shaft, forming a thin triangle from which the alignment is transferred.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Slope stakes in road or canal construction are set out to mark:
सही उत्तर: क) The points where the side slopes of a cutting or embankment meet the natural ground
Slope stakes show the outer limits of earthwork, i.e. the toe of fill or top of cut.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
In setting out the foundation trenches of a building by the centre line method:
सही उत्तर: घ) The centre lines of walls are marked first, and trench widths are set out on either side of them
Marking centre lines on profile boards allows the trench width to be set out equally on both sides.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
If each of n observations of a quantity has unit weight, the weight of their arithmetic mean is:
सही उत्तर: ग) n
The weight of the mean of n equally weighted observations is n times the weight of a single observation.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
The principle of least squares used in the adjustment of survey observations states that the most probable values are those for which:
सही उत्तर: ख) The sum of the squares of the residuals is a minimum
Least squares adjustment chooses values that minimise the (weighted) sum of squared residuals.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
In surveying, 'accuracy' refers to:
सही उत्तर: क) The closeness of a measurement to the true value
Accuracy relates to the true value; precision relates to repeatability of measurements.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
In GIS, 'metadata' means:
सही उत्तर: घ) Data describing a dataset, such as its source, date, accuracy and coordinate system
Metadata is 'data about data', helping users judge whether a dataset is suitable for their use.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
Georeferencing a scanned map or image in GIS means:
सही उत्तर: ग) Assigning real-world coordinates to it using control points
Georeferencing links image positions to ground coordinates so that the data can be overlaid with other layers.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
-
In GIS, an 'overlay' operation is used to:
सही उत्तर: ख) Combine two or more spatial layers to produce new information, e.g. land use within flood zones
Overlay intersects or unions layers so that their attributes are combined for analysis.
💬 टिप्पणी / गल्ती रिपोर्ट (०)
यी अभ्यास प्रश्न हुन्, आधिकारिक प्रश्न होइनन्। पाठ्यक्रम, विज्ञापन र नतिजाका लागि सम्बन्धित निकायको आधिकारिक वेबसाइट हेर्नुहोस्। उत्तरमा गल्ती भेटे प्रश्नमुनिको "टिप्पणी / गल्ती रिपोर्ट" मा लेख्नुहोस्।
नमस्ते! पाठ्यक्रम, सामान्य ज्ञान, भाषा परीक्षा वा कुनै प्रश्नको उत्तर बुझ्न सोध्नुहोस्।
AI ले गल्ती गर्न सक्छ। महत्वपूर्ण कुरा आधिकारिक स्रोतमा जाँच्नुहोस्।